²
Completed Design Items for Storage & Transportation
|
Employer |
Item & Scale |
Work |
Remark |
|
Lanshan Port Lquid Petrochemical Storage Station |
1000kt/a |
Feasibility Study Report |
|
|
Jinan Gas Company Dongjiao LPG Station |
4*400m3 |
Detailed Engineering |
|
|
Shandong Hongri Group |
8000m3 Sulfuric Acid Pot Area |
Detailed Engineering |
|
|
Shandong Haihua Group Bromide Plant |
Liquid Chlorine Storage Station |
Detailed Engineering |
|
|
Yantai Fishing Harbor Development Co. Ltd |
4000m3 Oil Storage Depot |
Detailed Engineering |
|
|
TaiAn LPG Company |
Storage & Distribution Station |
Detailed Engineering |
|
|
Jinan Gas Company |
5KNm3/d Gas Filling Station |
Detailed Engineering |
|
² Completed Design Items for Thermal Power Station
|
Employer |
Specification |
Work |
Remark |
|||
|
Item |
Scale |
Type |
Q’TY |
|||
|
Shandong weifang Soda Ash Plant Thermal power Branch |
Pulverized Coal Fired Boiler |
130t/h |
|
4 |
Feasibility Study Report, Preliminary Design, Detailed Engineering |
|
|
Steam Turbine Generator Unit |
|
B6-3.43/0.49 |
1 |
|||
|
|
CC12-3.43/0.98/0.49 |
1 |
||||
|
Weifang Chemical Plant Thermal Power Workshop |
Spreader Boiler (first stage) |
35t/h |
|
1 |
Feasibility Study Report, Preliminary Design, Detailed Engineering
|
|
|
Spreader Boiler (Second stage) |
35t/h |
|
1 |
|||
|
Steam Turbine Generator Unit (first Stage) |
|
B3-3.43/0.78 |
1 |
|||
|
Liangshang Power Station |
Pulverized Coal Fired Boiler |
35t/h |
|
1 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
N6-3.43 |
1 |
|||
|
Laiwu Hulin Power Plant |
Fluidized-Bed Boiler |
35t/h |
|
1 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
N6-3.43 |
1 |
|||
|
Changle Wutu Electric Power Station near Coal Mine |
Spreader Boiler |
35t/h |
|
1 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
N6-3.43 |
1 |
|||
|
Shouguang Thermal Power Station |
Pulverized Coal Fired Boiler |
130t/h |
|
1 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
CC12-3.43/0.98/0.49 |
1 |
|||
|
Jining Antibiotics Plant |
Chain Boiler |
35t/h |
|
2 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
B3-3.43/0.98 |
2 |
|||
|
Zibo Acid Factory |
Steam Turbine Generator Unit |
|
C1.5-3.43/0.49 |
1 |
Detailed Engineering
|
Power Generation by Residual Heat |
|
Jining Coal Chemical |
Chain Boiler |
35t/h |
|
1 |
Detailed Engineering
|
Centre Workshop designed as Double Boilers & Double Turbines |
|
Steam Turbine Generator Unit |
|
C3-3.43/0.98 |
1 |
|||
|
Dongping Chemical Factory |
Chain Boiler |
35t/h |
|
1 |
Detailed Engineering |
Centre Workshop designed as One Boiler & One Turbine |
|
Steam Turbine Generator Unit |
|
C3-3.43/0.98 |
1 |
|||
|
Nanding Thermal Power Plant |
Steam Turbine Unit |
35t/h |
CB12-3.43/0.98/0.49 |
1 |
Detailed Engineering
|
|
|
Beiing Daxing Nitrogen Fertilizer Plant |
Chain Boiler |
35t/h |
|
1 |
Feasibility Study Report, Preliminary Design, Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C3-3.43/0.98 |
1 |
|||
|
Jinan Oil Refinery Plant |
Oil-fired Boiler |
130t/h |
|
1 |
Feasibility Study Report, Preliminary Design, Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
B12-3.43/0.98 |
1 |
|||
|
Jining Electrochemical Plant |
Chain Boiler |
35t/h |
|
2 |
Preliminary Design, Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C3-3.43/0.98 |
1 |
|||
|
KengLi Oil Refinery Plant |
Chain Boiler |
35t/h |
|
2 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C3-3.43/0.98 |
2 |
|||
|
Tancheng Thermal Power Plant |
Cycling Fluidized-bed Boiler |
35t/h |
|
2 |
Feasibility Study Report, Preliminary Design, Detailed Engineering
|
|
|
Spreader Boiler |
35t/h |
|
2 |
|||
|
Steam Turbine Generator Unit |
|
CC12-3.43/1.57/0.49 |
1 |
|||
|
Tancheng Thermal Power Plant |
Spreader Boiler |
35t/h |
|
3 |
Detailed Engineering
|
Secondary Phase |
|
Steam Turbine Generator Unit |
|
C12-3.43/1.57 |
1 |
|||
|
Yantai Huali Thermal Power Sharers Co. Ltd. Thermal Power Plant |
Steam Turbine Generator Unit |
|
B6-3.43/0.98 |
1 |
Detailed Engineering
|
|
|
Zoucheng Nitrogen Plant |
Chain Boiler |
35t/h |
|
2 |
Preliminary Design, Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C6-3.43/1.27 |
1 |
|||
|
Qingdao Changhua Group |
Cycling Fluidized-bed Boiler |
35t/h |
|
2 |
Preliminary Design, Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C6-3.43/1.27 |
1 |
|||
|
Shouguang Lianmeng Chemical Group |
Cycling Fluidized-bed Boiler |
35t/h |
|
2 |
Detailed Engineering
|
Generator Part as Future Unit |
|
Hengsheng Chemical Group |
Cycling Fluidized-bed Boiler |
35t/h |
|
2 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C6-3.43/1.27 |
1 |
|||
|
DongE Chemical Plant |
Spreader Boiler |
35t/h |
|
1 |
Detailed Engineering
|
Generator Part as Future Unit |
|
Weifang Thermal Power Centre Company Crossing Heat Power Plant |
Steam Turbine Generator Unit |
|
B6-3.43/0.686 |
1 |
Detailed Engineering
|
|
|
Tancheng Town Heat Power Plant |
Cycling Fluidized-bed Boiler |
|
YG-75/3.82-M |
1 |
Detailed Engineering
|
3 Boiler Unit designed in Main workshop. Generator Part as Future Unit |
|
Luxi Chemical Group Liaocheng Chemical Plant |
Cycling Fluidized-bed Boiler |
|
UG-75/3.82-M12 |
2 |
Detailed Engineering
|
|
|
Steam Turbine Generator Unit |
|
C12-3.43/0.882 |
1 |
|||
|
Luxi Chemical Group Company |
Steam Turbine Generator Unit |
|
C6-3.43/0.98 |
|
Detailed Engineering
|
Power Generating by Residual Heat |
|
Rixing Chemical Group Company |
Cycling Fluidized-bed Boiler |
|
UG-75/3.82-M12 |
2 |
Detailed Engineering
|
|